Well-Head Gas Desander skids for Todd Energy
Jan 12
Todd Energy recently contracted Process Group to design, manufacture and supply four Well-Head Gas Desander skids. These are to be installed on Todd’s gas wells on the Mangahewa Development in Taranaki, New Zealand.
This will be the second time Process Group has supplied Todd Energy with high pressure Well-Head Desanding equipment for the Mangahewa field, as a similar Unit was supplied in 2003.
Read more
|
Macedon Produced Water Treatment Package for BHP
Process Group was recently awarded a contract by Technip for the design and fabrication of a Produced Water Treatment Package for BHP Billiton's Macedon Gas Plant Project, located onshore Western Australia.
The produced water treatment package is designed to handle a total capacity of 10,000 BPD, reducing the oil in water concentration from 1,000 ppm wt to <20 ppm wt.
Read more
|
Aug-2011Gas Dehydration Trains delivered to PNG Highlands
Process Group has completed the fabrication of the last of 3 trains of TEG Gas Dehydration equipment trains destined for the New Guinea highlands. These process trains are designed to reduce the moisture content of the gas flowing from the wells, before it is sent into the pipeline network that will feed the PNG LNG Facility located near Port Moresby. Read more
|